| Detailed Site Map Optional Use-Case Studies Optional Process Maps | ||
| High Level Site Map | ||
| Feature Value Matrix | ||
| WireFrames | ||
| User Testing | ||
| Revisions | ||
| Look and Feel Round 1 | ||
| Template Design 2 and Graphic Production (multiple batches) | ||
| Style Guide | ||
| Look and Feel Round 2 | ||
| Brand & Design Analysis | ||
| Look and Feel Round 3 | ||
| User Testing | ||
| Revisions / Template Design 1 | ||
| Proof of Concept Coding | ||
| Interface Development and Integration (multiple batches) | ||
| Analysis & Recommendations | ||
| Interactive Model | ||
| User Testing | ||
| Revisions from Testing Results | ||
| Integration Testing | ||
| Optimization and Quality Assurance Revisions | ||
| Requirement Gathering & Planning Technical Architecture and Specifications | ||
| System Architecture Programming Languages & Software Database Model Hardware and Networking | ||
| Software Build Technical Specifications QA & Testing | ||
| Deploy & Handoff and Technical Documentation | ||
| Design, Prototype and Functional Specifications | ||
| Requirements Gathering | ||
| Testing and Official QA sign-off | ||
| Test Plan: High Level Business and Client Requirements | ||
| Test Execution | ||
| Scripting Template Process: Create Test Scripts | ||
| Project Extranet | ||
| Progress Reports | ||
| Progress Reports | ||
| Project Wrap-up & Planning for Maintenance / Next Phase | ||
| Project Plan for Concept Development | ||
| High-level Creation Phase Estimate | ||
| High-level Project Plan for Transfer | ||
| Project Plan for Creation | ||
| Project Plan for Transfer | ||